Resample
Resampling period
Enter a positive integer to define the resampling period. To select the unit, use the drop-down list.
To remove the operation from the job, click the trash can button.
To move the operation up or down in the job sequence, use the arrow buttons next to the trash can icon.
/
To expand or collapse the operation, click the arrow in the top-right corner of the operation panel.