High Level Risks

The reference project is used as a base for creating the reuse project.

The High level risks provides a comparison of the reference project with the reuse project as follows:

  • Column 1
    Initial risk of the selected variant in the reference project.
  • Column 2
    Residual risk of the selected variant in the reference project.
  • Column 3
    Initial risk of the currently active variant in the reuse project.
  • Column 4
    Residual risk of the currently active variant in the reuse project.

It also shows the Security controls, TOE configuration, and Assumptions comparable to the Management summary or Variants pages.